One contract, one programme, one number to call

Whole-house projects go wrong in the gaps between trades — the week lost because the plasterer cannot start until the electrician comes back, and neither of them work for the same person. Running the whole project under one contract removes those gaps.

Full House Renovation

How a full renovation is sequenced

A full refurbishment runs in a fixed order: strip out, structural work, roof and windows to get watertight, first-fix services, plaster, second fix, decoration, flooring, then snagging. Getting that order wrong is what causes the classic disasters — new flooring laid before plastering, or a kitchen fitted before the rewire.

We produce a written programme with each stage dated and the dependencies visible, so you can see why week seven matters even though nothing appears to be happening.

Budget and contingency

Older properties hide things. Until walls come down and floors come up, nobody knows what is behind them, and any renovation budget without a contingency is a budget that will be exceeded. We build one in explicitly and tell you when we are drawing on it.

Every variation is priced in writing and agreed before the work happens. You should never receive an invoice containing something you did not know about.

How it runs

Our approach to full house renovation

  1. 01

    Survey and scope

    We walk the whole property, agree the scope room by room, and produce a costed schedule of works rather than a single headline figure.

  2. 02

    Programme and approvals

    A written programme with dated stages, plus any planning, Building Regulations and Party Wall matters resolved before we start.

  3. 03

    Build and hand over

    Stage-by-stage delivery with regular site meetings, then a joint snagging walkthrough and a handover pack with every certificate.

Recent work

A job like yours

The same reception room finished and decorated
Reception room stripped back to brick and joists before work
BeforeAfter
United Kingdom16 weeksFull house renovation

Victorian terrace, full refurbishment

A four-bedroom terrace taken back to brick and joists, replastered and finished throughout. Original cornice and ceiling roses were retained and restored rather than replaced.

  • Full strip out to structure
  • First and second fix throughout
  • Lime plaster to solid walls
  • Restored original cornice and joinery
  • Redecoration throughout

Questions

Full House Renovation — the usual questions

Next step

Get a quote for full house renovation

Tell us roughly what you have in mind and we will arrange a free site visit. No obligation, and no pressure afterwards.

Prefer to talk it through?

+44 7700 000000

Monday – Friday, 08:00–18:00

Request a free quote

The more you tell us, the more accurate the quote. Fields marked * are required.

So we can confirm we cover your area.

We use your details only to respond to this enquiry. We do not pass them to anyone else.

Tell us what you are planning

A free site visit, a written fixed quote, and no obligation to go any further. Most quotes are back with you inside 24 hours.

CallWhatsAppFree quote